Social publishing API · team console · agent tools
Publish once. Every platform answers for itself.
Rutba Relay takes one post and a list of destinations, fits the post to each platform’s rules, publishes to all of them in the background, and reports every delivery on its own. Build it into your product with one API, run your team’s calendar in the console, or hand the same tools to an AI agent.
One Rutba account. Connect each platform once; after that, publishing is a single request.
One post · one delivery for each destination
- published
Bluesky
text trimmed to 300 characters
- published
Mastodon
4 of 6 images; 2 dropped
- published
Telegram
sent as an album
- published
Discord
rate_limited, then published
- published
WordPress
title and tags as terms
- rejected
Reddit
content_rejected · not retried
An illustration of one post settling, not a live feed.

55
destinations in the live catalogue, each with its status
18
adapters written, one a test sandbox
6
open platforms, adapters written, no platform review
11
written and waiting on a platform’s own review
Watch
One post, every platform
A short film of the relay at work: one request in, a version for each platform out, and a signed answer back for each.
Per-platform adaptation
Write the post once. Each platform gets the version it will accept.
Platforms disagree about almost everything: how long a post may be, how many pictures it can carry, whether it needs a title, where a link goes. Rutba Relay keeps one neutral post and projects it onto each destination’s rules before anything is queued, so a problem is caught at the request, not ten minutes later on one platform.
- Text trimmed at a word boundary to each platform’s limit, media it will not take dropped, and every change reported as a warning for that platform.
- Preview runs the same projection the publisher runs, so what you preview is what each platform receives.
- Strict validation refuses instead of adapting, for a post that must go out exactly as written or not at all.
- The fields only one platform has (a subreddit, a title) travel as overrides on the same request.

What it does
The hard parts of publishing, handled once
Each of these is something you would otherwise build for every platform, and then maintain as each platform changes its mind.
One delivery per destination
A post fans out into deliveries, each with its own job, retry budget and result. A slow platform never holds up the rest, and six of seven is reported as partial: not as a failure, and not as a success.
Retries that cannot double-post
Send an Idempotency-Key and a repeated request returns the original response instead of publishing again. Retry one failed destination on its own; the platforms that already took the post are left alone.
Failures that say which kind
Every platform’s errors map onto one vocabulary: rate_limited, auth_expired, content_rejected and the rest. Transient failures are retried with backoff. A refused post is not, because the same bytes fail the same way.
Scheduling that knows the clock
Schedule to an exact instant, or to a wall-clock time in a named time zone. Daylight-saving gaps and repeats are resolved one documented way and the response says what was chosen.
Signed webhooks
Hear when a post publishes, partly publishes or fails, and when each delivery settles. Every event is signed over its timestamp and body, and every endpoint has a test event, a delivery log and secret rotation.
Connections without the OAuth work
Each account is authorised once, in the console or through a hosted connect link you send to whoever owns it. Tokens are encrypted at rest, and a connection that stops working is flagged once instead of failing every post.
How a post travels
From one request to an answer per platform
Nothing about publishing to many platforms is one outcome. So the API does not pretend it is: the request is accepted in one step, and each destination settles in its own.

- 1
Accepted
The post is checked against every destination and the API answers 202 with one delivery per target, before any platform is called.
- 2
Projected
Each delivery carries that platform’s version of the post, with a warning for everything that had to change.
- 3
Queued
Every delivery is its own job, so one platform’s outage or rate limit stays in its own lane.
- 4
Published or retried
Transient failures back off and try again. A refusal stops at once, with the platform’s reason in the result.
- 5
Reported
The post settles as published, partial or failed, and your webhook hears about the post and each delivery.
For developers and integrators
One API instead of an SDK per platform
Your product publishes on your customers’ behalf without you owning an adapter for every network, the token refresh logic, or the difference between how each one fails.
For social teams and agencies
A calendar the whole team can work in
The Relay console is built on the same public API: a composer that previews every platform, a calendar across time zones, reviews before anything goes out, and analytics on what actually landed.
For AI agent builders
Tools an agent can use without being trusted blindly
An MCP server gives any MCP client the relay’s tools under your own API key. Creating a post makes a draft unless publishing is asked for, and read-only mode removes the writing tools from the list altogether.
From your side
One request out. One signed event back.
Publish with a single call, receive a signed event when the post settles, and check the signature in a dozen lines of standard library code.
curl -X POST https://api.relay.rutba.io/v1/posts \
-H "Authorization: Bearer $RELAY_API_KEY" \
-H "Idempotency-Key: launch-2026-09-15" \
-H "content-type: application/json" \
-d '{
"content": {
"text": "Version 4 is out. Here is what changed.",
"link": "https://example.com/changelog/4",
"media": [{ "id": "med_…", "alt": "The new dashboard" }]
},
"platforms": ["bluesky", "mastodon", "telegram"],
"scheduled_at": "2026-09-16T09:00",
"timezone": "Europe/London"
}'POST /hooks/relay HTTP/1.1
x-relay-event: post.partial
x-relay-delivery: whd_…
x-relay-signature: t=1757926804,v1=5f0c…
{
"id": "evt_…",
"type": "post.partial",
"created_at": "2026-09-16T08:00:04.512Z",
"data": {
"post_id": "…",
"status": "partial",
"external_id": "launch-42",
"succeeded": 2,
"failed": 1,
"deliveries": [
{ "platform": "bluesky", "status": "succeeded", "remote_url": "https://…" },
{ "platform": "mastodon", "status": "succeeded", "remote_url": "https://…" },
{ "platform": "telegram", "status": "failed", "error_code": "rate_limited" }
]
}
}The signature covers the timestamp and the exact body, so a captured request cannot be replayed later, and a body re-serialised by your framework will not match. Verify the raw bytes.
Security and reliability
Built to be trusted with other people’s accounts
A publishing service holds the keys to somebody’s audience. The controls below are in the product’s code; the security page says how each one works.
- Tokens encrypted at rest
- Platform credentials are sealed with AES-256-GCM and decrypted only when a request is made to that platform.
- Keys stored as hashes
- An API key is shown once, when it is created. What is stored cannot be turned back into it.
- One Rutba sign-in
- People sign in with their Rutba account, which offers two-step verification. There is no separate Relay password to leak.
- Organisations kept apart
- Every read is scoped to the organisation asking. Another organisation’s post does not exist, as far as the API is concerned.
- An audit trail
- Every action that touches a credential is recorded, whether a person took it or an API key did.
- Kill switches
- Publishing can be paused for a platform, an organisation or one connection. Paused deliveries wait; they are not failed.

Platform status
Where each platform stands, today
Read from the live catalogue on every visit, including the platforms that are not ready yet and what each is waiting on. It is an unusual thing for a product page to lead with; it is also the thing that decides whether this is any use to you.
Open APIs, adapters written. Once enabled, each publishes as soon as an account is connected.
- Bluesky
- Discord
- Mastodon
- Telegram
- WordPress
- Slack
Adapters written; each platform reviews the app before it can post for anyone.
- Facebook Pages
- Threads
- TikTok
- YouTube
- X / Twitter
- Google Business Profile
- Snapchat
No adapter yet, or no way for anyone to publish there. Each is listed with its reason.
See each one →Questions
What people ask before they connect an account
Which platforms can I publish to today?
The platforms page lists every destination in the live catalogue with its real status. Platforms with open APIs need no review: once one is enabled, it publishes as soon as you connect an account, and the page marks which are connectable now. For the mainstream networks whose adapters are written, each platform’s own app review still stands between the code and a live post, and the page says what each one is waiting on.
Do I need the console, or can I use only the API?
The API covers publishing, scheduling, previews, media, templates, webhooks and the delivery log. An account on a platform that signs in with OAuth still has to be authorised in a browser once (that is the platform’s rule), which you can do in the console or by sending a hosted connect link to whoever owns the account. Platforms that use a token, app password or webhook URL can be connected over the API.
What happens when one platform rejects a post?
That delivery stops and the others carry on. Its result says whether the post was refused (the content breaks a rule, so it is not retried) or failed for a transient reason (retried with backoff), and the post settles as partial rather than as one pass or fail.
Can a retry publish the same post twice?
Not if you send an Idempotency-Key: a repeat of the same request returns the original response instead of publishing again. Retrying one delivery replays only that destination, never the ones that already published.
How do scheduled posts handle time zones?
Send an exact instant, or a wall-clock time with an IANA time zone such as Europe/London. Times that fall in a daylight-saving gap, or happen twice when the clocks go back, are resolved one documented way and the response says which time was used.
Can our team review posts before they go out?
Yes. A post can be submitted for review, then approved, sent back to its author with changes requested, or rejected, and every round stays on the post. A post waiting on review cannot be published. Approvals depend on the plan.
Can we use our own platform app credentials?
Yes. An organisation can register its own app for a platform, and OAuth connections to that platform use it from then on, which matters when a platform has approved your app, or when you publish under your own brand.
How do AI agents use it?
Through an MCP server that exposes ten tools over your own API key: reading platforms, connections, posts, metrics and deliveries; previewing a post; and creating, publishing and cancelling posts. Read-only mode removes the three writing tools entirely, and the key’s scopes apply either way.
Where do the prices come from?
From Rutba’s price list, read live by the pricing page. The site holds no prices of its own, so it cannot quote a figure the checkout will not honour, and if the list cannot be reached, the page says so rather than showing an old number.
How do I remove a connected account or our data?
Disconnecting an account removes its stored credentials. The data deletion page explains how to do that, how to revoke access from the platform’s side, and how an owner asks us to close an organisation entirely.
Publish to every platform from one request
Create your Rutba account, connect an account on an open platform, and send your first post.